Catch up on the latest GSA board meeting recaps anytime—at home, on the road, or on your tractor.
Proud Partners of





Staff recommended against the proposed one-time golden mussel treatment in 2026, favoring a broader 2027 approach; no treatment vote was taken. The committee approved $25,000 for Pool 3 repairs without scheduling the roughly two-week outage and increased the membership-fees budget by $10,400. Staff will circulate revised A/B power-cost allocations for review before issuing invoices or refunds; the agency holds about $800,000 in participant funds.
The board approved automatic reductions for eligible late-reporting penalties in the backlog, including a one-time first-violation waiver, even without written requests. Staff reported $11.5 million assessed in its late-reporting review, $1.3 million waived and $280,000 paid. Las Posas Valley Water Year 2026 allocations were adopted at about 40,000 acre-feet overall, with individual changes reflecting transfers and ownership changes. Future penalty rules and owner-operator reforms remain under consideration.
SHAC approved its July 22 minutes. Draft groundwater plan documents are open for comment through October 26 and find the sub-basin on track for its 2042 sustainability goals. On October 14, the Vina GSA board will discuss a proposed minimum-threshold alternative and the non-dry-year clause; any further SHAC review depends on board direction. SHAC is scheduled to review proposed local management levels October 28.
The General Manager said the Forebay appears near water-balance equilibrium, while the revised GSP draft—especially Chapters 9–10—still needs updating ahead of a public hearing targeted for early Jan. 2027. Public commenters cited missing/blank tables and inconsistencies. A Water Coalition representative said a model may overestimate surface flows by ~75%. Northern seawater-intrusion projects were cited at ~$1B.
NWS forecast a very strong El Niño with higher odds of above-normal precipitation, with wetter conditions likely backloaded into January–February. Staff outlined expanded flood-preparedness outreach for hotspot areas and creekside owners and reviewed shared maintenance responsibilities. The board approved added funding for the desalination feasibility study.