Stay on top of SGMA

Catch up on the latest GSA board meeting recaps anytime—at home, on the road, or on your tractor.

No credit card required

Proud Partners of

AG Center logo
APG logo
Fresno State WET Center logo
SJV Water logo
Water Wrights logo
February 24, 2026

The board voted 3-2 to impose new contract terms on field employees after failed negotiations with IBEW Local 1245, including a 7-on/7-off schedule and revised overtime and health insurance structures effective March 2026. The 2026 irrigation season was unanimously set to begin March 11, with water flowing into the main canal March 2. Staff also reported re-engaging Division 9 growers following a failed rate vote, with follow-up meetings planned to build toward a revised proposal.

Loading...
Read more →
February 24, 2026

Groundwater pumping remains well below the district's roughly 1.8 million acre-feet in groundwater credits, though transitional pumping limits restrict how quickly those credits can be used. Monitoring shows mostly healthy aquifer levels district-wide, with localized concerns along the southeastern boundary likely linked to neighboring pumping. Subsidence is stable, though one southeastern benchmark has exceeded the annual minimum threshold, attributed largely to neighboring pumping activity.

Loading...
Read more →
February 23, 2026

The board approved hiring Provost & Pritchard to analyze groundwater allocation policy options, with a draft report expected in 10–14 weeks and no policies selected yet. An annual cash call of $18,040 per member was approved to fund ongoing operations as grant funding runs out. A member of the public raised concerns about oilfield wastewater disposal threatening west side groundwater quality, with a state hearing upcoming to contest current de-designation efforts.

Loading...
Read more →
February 23, 2026

Staff reported on development of the 2025 Urban Water Management Plan, which uses WSMP 2050 demand projections to assess supply reliability through 2045, with a draft expected for public review in May 2026. Concerns over past demand overestimates were raised, and staff were urged to meet with the Sierra Club to review its alternative model. The 2026 Groundwater Management Plan periodic evaluation is on track, with a public comment period expected to open in September 2026.

Loading...
Read more →
February 20, 2026

The basin showed improvement in Water Year 2025, with the critical Eastern Principal Aquifer gaining 5,000 acre-feet of storage and remaining ahead of interim milestones. Some wells still exceeded minimum thresholds, but interim milestones were not exceeded in the Eastern Principal Aquifer. Four new well applications were received, and a monitoring well installation project continues progressing through permitting.

Loading...
Read more →
1
...
129
130
131
...
235
Spot anything wrong?
Reach Out at Waterone.ai
Content made with the help of AI. 100% human-reviewed.