Vina GSA

Upgrate to Platform Plan to see more details. Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation

No allocation at this time
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation Documents

Allocation Base Rules

Other Document

Helpful Link

April 22, 2026

The committee approved the prior meeting minutes and unanimously passed two recommendations to the board: (1) that the upcoming GSA's periodic evaluation (PE) state the GSA will develop a well mitigation program within the next five-year implementation period, and (2) that the board dedicate FY 2026–27 budget funds to initiate the planning process in early 2027. Staff analysis estimated ~400–462 sustainably-constructed domestic wells are above the current MT level (24–32%), with worst-case...

Loading...
Read more →
April 8, 2026

Groundwater levels rose ~3 feet and storage increased ~44,000 acre-feet in Water Year 2025; staff reported groundwater levels, quality (specific conductivity), and subsidence criteria showed no exceedances. May–Aug 2026 are key months for domestic well mitigation/registry discussion, minimum thresholds, and interconnected surface water. Draft periodic evaluation/updates targeted by late summer; adoption by year-end. RFP in progress.

Loading...
Read more →
March 25, 2026

Two surface-water options to offset pumping were presented: South Vina Extension (~6,970 AFY) and Ridge to Valley (1,500–3,500 AFY), with delivered costs discussed at ~$300–$425/AF vs. $60–$80/AF pumping. Demand reduction work highlighted extended orchard replacement and small-farm precision irrigation. Lindo Channel work suggested ~20–100 AF/day of added recharge when flow occurs.

Loading...
Read more →
March 11, 2026

Lindo Channel appears to provide ~100 acre-feet/day of recharge when flowing, with a final report due in early April. Presentations suggested the ~10,000 AF/year overdraft can be managed via recharge, surface water supply, and demand reduction—especially extended orchard replacement. Two surface-water options were presented, but costs exceed pumping rates, so incentives/grants may be needed.

Loading...
Read more →
February 11, 2026

The Board approved formation of a Financial and Administrative Systems Ad Hoc Committee to guide the transition toward greater operational independence, with two members serving for nine months. A $536,000 contract amendment was approved to support groundwater monitoring well installation targeted for late February or early March. Recharge feasibility work is advancing, with a potential pilot site on Comanche Creek under active development.

Loading...
Read more →