Madera County GSA

Upgrate to Platform Plan to see more details. Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation

Groundwater Allocation - 2026 Total allocation varies by subbasin: Madera Subbasin: 25.2 inches ETAW/acre total
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation Documents

Allocation Base Rules

Helpful Link

July 1, 2025

The committee reviewed multiple groundwater monitoring platform options and recommended a domestic well mitigation fee structure that would be significantly offset by growing penalty revenue collections. Penalty collections increased from $55,000 to $427,000 year-over-year, providing substantial relief for the proposed mitigation fees.

Loading...
Read more →
1
2