Catch up on the latest GSA board meeting recaps anytime—at home, on the road, or on your tractor.
Proud Partners of





The board approved a $22.90/AF FY 2026-27 groundwater sustainability fee (Resolution 2026-001) for collection on the county tax roll; the vote was 4-0 (unanimous). Appeals of LandIQ consumptive-use data are due June 8; staff plans to return in June with appeal recommendations. A Fallowed Land Registry demo was presented; a virtual training is set for June 3.
Water supplies significantly exceed demand and staff said supplies are tied to CCWD water rights; a projected 2050 population decline could pressure rates. Water loss exceeds the state standard (about 89 g/conn/day; ~429M gal/yr cited); staff outlined steps to improve data and seek an adjusted standard. FY 2026-27 prelim budget: ~$42.2M revenue/$40.9M expense and a ~$20M 5-year water CIP shortfall; no Board action taken.
The committee voted unanimously to recommend replacing groundwater-level proxies with InSAR satellite data and paired monitoring wells to directly measure land subsidence, with a 0.5-foot cumulative threshold. On interconnected surface water, it recommended a combined show-progress/proceed-carefully approach while deferring new SMCs (6–1, with 1 abstention/non-vote). Next: groundwater-level SMCs and GDE topics (incl. Valley Oaks/urban forest).
Board approved the FY 2026-27 budget and $16.31/AF extraction fee (Resolution 2026-01). A Prop 68 demonstration update compared flow meters, power-use, and ET methods for tracking pumping; formal measurement/reporting rules are still to be developed. Stetson Engineers reported the GSP 5-year evaluation is underway with improved basin conditions; staff indicated plan-amendment decisions may be needed by Sept. 1, 2026.
The board adopted a $1.45/acre operations fee for FY 2026-27 and approved a ~$632k baseline budget (~$650k revenue). Discussion noted a ~$65k shortfall after last year's fee reduction and highlighted upcoming work on demand management (due Jan 2027) and domestic well mitigation. The demand management program is advancing with legal and procedural complexity around potential pumping fees still being worked through.