Arvin Edison Water Storage District

Upgrate to Platform Plan to see more details. Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation

Arvin Edison Water Storage District is part of two GSAs: the Arvin GSA (which it formed for the Kern County Subbasin) and the White Wolf Subbasin GSA (which it formed jointly with three other agencies). Arvin GSA has no allocation at this time
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation Documents

Helpful Link

November 12, 2026

The committee ratified prior home-board decisions on revised exceedance, degraded-water-quality, and well mitigation measures. State small water systems with dry wells could receive up to $100,000 in one-time aid; interim assistance covers only emergency drinking water, not hauled water. Arvin-Edison reported home-board approval of a Frick Unit contract and $40 million I-Bank loan. First-quarter maps showed no subsidence threshold exceedances at local aqueduct and canal mileposts.

Loading...
Read more →
November 10, 2026

The board approved a roughly $77 million preliminary budget and preliminary 2027–28 water-service charges. If temporary water is declared, staff plans to rebate revenue from water sales above 120,000 acre-feet; at 130,000 acre-feet, staff illustrated about $22 per acre. The board advanced planning for three high-risk stand tanks. Staff reported a 3% South-of-Delta allocation increase, about 90 acre-feet, though delivery remains uncertain.

Loading...
Read more →
October 13, 2026

The board approved submitting an IBank certification seeking $40 million; final loan terms and approval remain ahead. Staff will develop possible delivery-based water rebates for the November budget. Proposed budgets will also include a $50-per-acre-foot on-farm recharge program for board consideration, intended for periods when district recharge capacity is full and additional water is available.

Loading...
Read more →
July 14, 2026

Board took no vote/action on the $1.3M Phase 2 mussel treatment while reviewing liability/insurance and alternatives; an August special meeting was discussed. Water supply is 100% Class 1, 0% Class 2, with earlier season taper expected. Board adopted Subsidence Exceedance Policy v2.0.

Loading...
Read more →
June 9, 2026

Water supply remains strong at a 100% Class 1 allocation, with ~11,000 AF of additional Tier 2 restoration flows expected. Kern Subbasin partners are revising the subsidence action plan to align with DWR BMPs, including critical head analysis, with an appendix amendment expected for board action next month. Spring sampling found exceedances at three wells; some notices sent, others pending investigations.

Loading...
Read more →