Porterville Irrigation District GSA

Allocation

2026 Total allocation (ET-based method): 1.01 af/ac - Precipitation Yield: 0.86 af/ac
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation Documents

Helpful Link

November 10, 2026

The board approved Superior AG’s $175,748.52 bid plus a 10% contingency for a temporary recharge basin to receive water during heavy flows. Staff forecast nearly 2 inches of rain in mid-November, with high snow levels. The district has 1,288 acre-feet of Class 1 water remaining; it may carry that water into next year if conditions stay dry, subject to Bureau of Reclamation authorization.

Loading...
Read more →
November 5, 2026

The Stakeholder Committee recommended certified meters for all wells by the end of the 2026–27 water year and a penalty of up to $10,000 per well, subject to board action. Staff proposed mailing local extraction bills around December 1, 2026, due at the end of January 2027. State GEARS fees were estimated at $300 per well and $20 per acre-foot, pending confirmation. Staff is drafting a Friant-Kern Canal subsidence plan; no allocation change was adopted.

Loading...
Read more →
October 13, 2026

The Porterville Irrigation District board directed staff to keep recharge water available for purchase through December 31; about 1,500 of 17,000 acre-feet credited to accounts had been claimed. The board voted to open water banks for remaining CVP supply, with irrigation first. Service Area 3’s first-phase pipeline could go to bid after easement sign-off, and the redesigned P1 and Porter Slough Ditch project is expected to bid in November.

Loading...
Read more →
October 1, 2026

Staff plans to bring PID GSA’s draft groundwater plan to its Board, but the committee did not recommend adoption; a member sought water-budget clarification. State officials may propose Friant-Kern Canal-area pumping restrictions for possible implementation in April 2027; no moratorium was adopted. Mandatory well metering remains under discussion. Staff reported replacing a 34-year rolling-average precipitation allocation with actual monthly credits going forward.

Loading...
Read more →
September 17, 2026

Staff reported that the Tule Subbasin is prioritizing a local alternative to a potential state pumping moratorium, with a technical meeting set for September 30. Allocation figures discussed included 0.27 AF/acre for metered pumping extraction and 0.15 AF/acre native sustainable yield under ET-based accounting. Starting October 2026, accounting shifts from an allocated precipitation amount to actual precipitation received. The PID GSP draft is posted for review ahead of an October 1 stakeholder meeting.

Loading...
Read more →