August 2026 Board Meeting

8/21/2026
Loading...

Top 3 Key Takeaways

1. The State Water Board Could Impose Pumping Moratoriums as Early as April 2027 The state presented its interim plan for the Tulare Lake Subbasin, starting with the Tule Sub-basin. Phase one proposes a two-mile pumping moratorium on either side of the “Friant Kern” canal/corridor (as referenced in discussion) — including recharge water extraction — and phase two targets pumping restrictions around domestic and supply wells deemed at risk of going dry. The state has scheduled a draft interim plan for January 2027 with a board hearing for adoption in April 2027. Geosyntec consultant Amir noted that a similar framework could be applied locally with the Corcoran levee substituted for the canal, and a meeting with state staff on this topic is being planned (likely early September).

Already have an account? Sign In

Firms & Consultants

Sarah Chen

Environmental Science Associates

CONSULTANT

Michael Rodriguez

Provost & Pritchard

CONSULTANT

View detailed participant information including consulting firms, presenters, and meeting roles.

Spot anything wrong?
Reach Out at Waterone.ai
Content made with the help of AI. 100% human-reviewed.