Current Water Supply at 100% Class 1 with Optimistic Outlook The District is currently maintaining 100% Class 1 allocation for the ongoing contract year, with potential for some residual Class 2 if warm storms drive reservoir operations. Three to four storm systems are expected to arrive in November, potentially bringing 6 inches of precipitation to the San Joaquin watershed over the next 10-14 days. Despite wide forecasting ranges (from 50% to above 100% allocation scenarios), the District's water portfolio is sufficient to continue operations through February 2026 before tapping into San Luis Reservoir supplies.
Already have an account? Sign In