1. New Groundwater Monitoring Method Approved Using Satellite Technology The Board approved a $35,000 contract with Zanjero for satellite-based evapotranspiration (ET) measurement to estimate groundwater pumping. This technology is becoming the industry standard across the San Joaquin Valley and will provide field-by-field water use data that can be cross-checked against SSJID's existing water delivery records and groundwater model estimates. This method could eventually be used for more detailed annual accounting and allocation management at the individual farm level.
Already have an account? Sign In