November 2026 Board Meeting

11/12/2026
Loading...

Top 3 Key Takeaways

1. FID Outlines Routing Plans for a Potentially Wet Winter Staff described plans to route local stormwater safely through canals to recharge basins, then bring in Friant and Kings River floodwater when available and capacity permits. FID coordinates with the Fresno Metropolitan Flood Control District; facilities including Big Dry Creek and Stansel reservoirs help regulate creek flows before they enter district canals. Directors also discussed a state-law restriction on putting water into the Red Banks flood-control basin because of its proximity to a Superfund site that participants said had been cleaned up. The National Weather Service outlook calls for wetter-than-average conditions over the next three months, and staff raised El Niño as a possibility. Major flood releases often begin in late February or early March, but local storms can arrive sooner, and construction can limit routing capacity.

Already have an account? Sign In

Firms & Consultants

View detailed participant information including consulting firms, presenters, and meeting roles.

Spot anything wrong?
Reach Out at Waterone.ai
Content made with the help of AI. 100% human-reviewed.