1. The GSP 5-Year Evaluation was adopted. The board voted 3-0 to adopt the Western Management Area’s Groundwater Sustainability Plan 5-Year Evaluation and authorize its finalization and submission to the California Department of Water Resources ahead of the January 2027 deadline. No public comments were received on the public draft. Stetson Engineers anticipated only minor edits, such as figure and well-survey notations.
2. Proposition 68 projects are advancing. EKI reported that project components need to be completed by the end of February 2027 under an extended grant deadline in March. Work includes well-extraction measurement and reporting, completed stream-gauge installation and ongoing monitoring, planned monitoring-well installation, groundwater-dependent ecosystem studies, seawater-intrusion analysis, stormwater capture and infiltration, a water-use efficiency strategic plan, and a recycled-water feasibility study. Demonstration-project findings will also inform proposed well-registration, metering and reporting rules. Staff said that policy work should be coordinated with the Water Conservation District.
Already have an account? Sign In