East Kaweah GSA

Upgrate to Platform Plan to see more details. Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation

2026 Total allocation: 2.5 af/ac (hard cap), 1.54 af/ac (before the $500/af fees) Native Yield: 0.82 af/ac at no cost
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation Documents

Allocation Base Rules

Other Document

Helpful Link

Helpful Video

July 11, 2025

The committee received positive news that State Water Resources Control Board staff is developing a report to recommend moving the subbasin to DWR oversight, expected for a November 4th hearing. The committee also approved 2026 water allocations with no changes from 2025 levels and discussed significant budget increases through a proposed Proposition 218 land-based assessment that could raise rates from $7.45 to as much as $27 per acre maximum.

Loading...
Read more →
1
2