Lower Tule River Irrigation District

Upgrate to Platform Plan to see more details. Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation

2026 Total allocation: 1.87 af/ac - Precipitation Yield: 0.76 af/ac [can be reused when cover crops are not consuming water as measured by ET, capped at 0.96 af]
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation Documents

Allocation Base Rules

Other Document

Helpful Link

September 9, 2025

The board formally submitted an exclusion request from state probationary status after months of collaboration with regulatory staff. A $5.2 million budget increase was approved due to additional water purchases beyond normal allocations, while the well registration effort continues with 68% of landowners complying and two growers paying penalty rates of over $1,300 per acre-foot for unregistered water use.

Loading...
Read more →