Compare Agencies

Allocation

- 2026 water year (district moved ET accounting to an Oct–Sep water year) - Management Area 2 (MA-2) groundwater ET allowance: 2.84 af/ac annual limit - Jan–Sep 2026 transition (9-month stub): 2.58 af/ac (91% of the annual limit, prorated to the ET curve)
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Latest Meeting
9/9/2026